Deals at MyTruckPoint
BX88274BlueOxHighCurrentFuseBypassSwitch8.jpg
Cropped-logo.png
BX88274.jpg
BX88274-IMG_1370.jpg
BX88274-IMG_1374.jpg
BX88274-IMG_1372.jpg
BX88274-IMG_1377.jpg
California-Proposition-65-Warning-GENERIC.jpg
BLU-BX88274_01.jpg

Blue Ox BX88274 Fuse Bypass Switch Multi-Fit High Current Type Long Lead.

Regular price
$191.00 USD
Regular price
$287.00
Sale price
$191.00 USD
Save $96.00
In stock
Vendor: Blue Ox
SKU: FDRW_BX88274
Availability: 7 In Stock
Product Type: Multi-Purpose Fuse
Check fitment
Select your vehicle below

Secure checkout

* Images may differ from actual product.

Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. The Fuse Bypass Switches are available in four different models. See application guide for fit information. This switch provides a safe alternative to the constant removal and re-installation of the fuse when changing from the towed mode to the driving mode.

Free over $99Standard shipping on most eligible orders (Canada & USA)
1–2 business daysTypical ship time for in-stock items
3–7 business daysTypical delivery after it ships
60 daysTo return eligible items

Shipping

  • Free shipping on most eligible orders over $99 in Canada and the USA.
  • Orders before 2:00 p.m. usually process the same business day (estimate, not a guarantee).
  • Carriers: Purolator, FedEx, Loomis Express, and freight carriers when needed.
  • No P.O. boxes. Please give a physical delivery address.
  • Extra time may be needed for custom, made-to-order, backordered or oversized items, warehouse transfers, customs, weather or carrier delays. Delivery time starts after your order ships.

When extra shipping charges apply

  • Heavy or oversized items (about 150 lb or more, or over parcel size limits) may ship by LTL freight with extra charges.
  • Remote areas such as Yukon, Northwest Territories, Nunavut, parts of Vancouver Island and other carrier-surcharge addresses don't qualify for free shipping.
  • We'll always tell you about any extra charge before your order ships.

Missing or damaged deliveries

  • If tracking shows delivered but you can't find it, contact us right away and we'll investigate.
  • Check your delivery soon and report any damage, ideally within 10 days. Keep the box, labels and photos so we can file a claim for you.

Returns

WhenWhat you getItem condition
Within 30 days of deliveryRefund to original paymentUnused, not installed, with all parts and original packaging
Days 31–60Store credit onlyUnused, not installed, in unopened original packaging
After 60 daysReturns not accepted (legal rights still apply)

Return fees

  • 20% restocking fee plus return shipping on approved returns, including oversized and freight items and parts ordered for the wrong vehicle.
  • Original shipping is not refunded on change-of-mind returns.
  • No restocking fee if the mistake was ours.
  • We may decline a change-of-mind return if return shipping would be more than 50% of the item's value.

Items that can't be returned

  • Used, installed, test-fitted or altered items, or items missing packaging or parts
  • Electrical or electronic items
  • Chemicals such as cleaners, oils and lubricants
  • Clearance, discontinued and final-sale items
  • Mount-and-balance, special-order and custom items
  • Select UnderCover tonneau covers, Rough Country items after 30 days, drillable wheels, and Braelin, Armed Off-Road, Armed Street and Armed Syndicate wheels

How to return

  1. Start your request with our Online Return Form.
  2. Take photos of the item and packaging before you ship it.
  3. Use your own carrier, or ask us for a prepaid label (its cost comes off your refund). One item per box unless we say otherwise.
  4. We inspect returns within about 2 weeks of receiving them and send refunds 7–10 business days after approval.

Exchanges: we don't do direct exchanges. Return the item and place a new order, or choose store credit.

Cancellations

Order typeCan I cancel?
In-stock, not processed yetYes, no fee
In-stock, processed but not shippedYes, 5% cancellation fee
Already shippedNo, but you can return it (see Returns)
Backorder or special orderNo. If we approve an exception: 20% fee within 30 days of ordering, 25% after 30 days

Refusing a delivery or filing a chargeback doesn't cancel an order. Please contact us first so we can help.

Warranty & Fitment

  • Defective, damaged or missing parts: contact us through the return form or support and we'll help with the warranty. You can also contact the manufacturer directly.
  • Check fitment before ordering. Not sure? Call or chat with us and we'll confirm it for you.

Gift Cards & Pricing

  • Gift cards don't expire where the law says so and are generally non-refundable. Store credit can be issued as a gift card.
  • If we find a pricing error, we'll contact you before processing the order.

Questions? We're here to help.

Phone: (800) 292-4173 (Mon–Fri, 9 a.m.–5 p.m. ET)
Email: support@mytruckpoint.ca
Returns: Start a return or warranty request

Delivery times are estimates. This policy applies subject to consumer protection laws in your province or state, and doesn't limit your legal rights for defective, wrong or misrepresented products.
Free shippingover $99
60-dayreturns
Free pickupover $200
CanadianKitchener, ON
Who we are

About MyTruck Point

MyTruck Point is a Canadian company based in Kitchener, Ontario. For more than 10 years, we’ve helped truck owners, fleets and businesses across Canada find the right parts and accessories for their trucks, cars, RVs and boats.

We sell genuine parts as an authorized dealer of leading brands, and our team will confirm fitment before you order. When you call or chat, you reach real people who know trucks.

(800) 292-4173Mon–Fri, 9 a.m.–5 p.m. ETPickup in Cambridge & Scarborough
10+Years serving Canada
100,000+Orders delivered
380,000+Products online
2Ontario pickup locations

Before You Buy Anywhere, Compare

Here’s what you get with MyTruck Point, and what to ask any other seller.

What mattersMyTruck PointOther sellers
Genuine parts from an authorized dealer of leading brandsYes Ask
Free shipping on most eligible orders over $99 (Canada & USA)Yes Ask
Ships in 1–2 business days for in-stock itemsYes Ask
60-day returns on eligible unused itemsYes Ask
Free local pickup in Cambridge & Scarborough over $200Yes Ask
Fitment confirmed by a real person before you orderYes Ask
Warranty help if a part is defective or damagedYes Ask

Questions? Call (800) 292-4173 or use live chat, Mon–Fri 9 a.m.–5 p.m. ET.

In-house experts
Price match 10% of difference
Hassle-free returns
Free shipping
Warranty covered
Secured transaction

Verified Review from Canadian Customer